The Egyptian Company for Chemicals (ECC) was in process of transforming a spinning and weaving plant in New Borg Al-Arab City to manufacture solid sodium silicate. The company commissioned Environics and the Egyptian National Cleaner Production Center (ENCPC) to prepare the EIA study required for this project.
According to the Egyptian laws and regulations, this project required a Form B EIA study. Environics carried out site visits and document reviews to prepare the EIA, which covered the construction and operation phases of the project.