- The Egyptian Magnesium Company (EMAG) had contracted Environics to EIA required for the project.
- Within the scope of this study, a flash flood investigation was carried out, which studied the geological and morphometric parameters, and assessed the flash flood hazards, as well as the existing and planned protection works at the site.