- SEGAS had intended to construct and operate a waste management area for hazardous waste; and a storage facility for pressurized gas cylinders utilized for analytical purposes.
- SEGAS had designated locations for both purposes and commissioned Environics to carry out a comprehensive study of the legal requirements.
- The study identified the technical and regulatory storage requirements for waste and for gas cylinders, as well as the national health and safety governing regulations in this case.