- This ESIA, which was carried out for Scatec Solar, covered the construction, operation, decommissioning phases, as well as the waste management activities.
- The ESIA covered the detailed baseline including air quality, noise and flash flood hazards, as well as the socio-economic aspects.
- The ESIA was carried out in accordance with the Egyptian environmental law and regulations, as well as the requirements and standards of the international funding institutions, specifically those of the European Bank for Reconstruction and Development (EBRD) and the International Finance Cooperation (IFC).