EIA Studies for the expansions within L’Oreal plant in 10th of Ramadan City

Share:

2015

  • Environics prepared an EIA study (Form-B) for the addition of a new Skin Care Unit to produce the following:
    • BB Cream.
    • Jar Creams Garnier.
    • Face Wash.

2016

  • Environics prepared an EIA study (Form-B) for the second expansion in the plant to:
    • Add an Oil Replacement production line.
    • Establish a drying basin for the generated wastewater treatment sludge.
    • Construct a pressure reduction room for the boiler’s Natural Gas.

Both studies encompassed: a description of the project and the relevant environmental laws and regulations.  They assessed the environmental impacts, recommended appropriate mitigation measures for each impact, and developed the Environmental Management & Monitoring Plan.