- Environics developed the terms of reference for the Algerian consultancy to be chosen to prepare the ESIA required for the project.
- The ESIA was revised and commented on by Environics.
- Environics also reviewed the ESIA and QRA studies prepared for this project, identify their gaps, and recommend actions to address these gaps.
- The final studies were produced to comply with both the Algerian regulations and the IFC.